Documents by project
Documents by project
Choose a project type and kind of works; the list comes from catalog/docmap. No prices on this page: see the offer.
151 rows, we make 61 of them
A. СТАРТ (initiatief / haalbaarheid)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 1 | Programme of requirements (PvE) Programma van Eisen (PvE) | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 2 | Feasibility and budget study Haalbaarheidsstudie | At a specialist | unchecked |
| 3 | Plot passport / image quality plan Kavelpaspoort / beeldkwaliteitsplan | At a specialist | unchecked |
| 4 | Check against the omgevingsplan (zoning plan) Toets omgevingsplan | At a specialist | IPLO: Bruidsschat omgevingsplan |
| 5 | Cadastral survey of the plot Kadastrale inmeting | At a specialist | unchecked |
| 6 | Pre-application consultation / preliminary request Vooroverleg / principeverzoek | At a specialist | IPLO: Conceptverzoek in het Omgevingsloket |
| 7 | Project schedule Projectplanning | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 8 | Agreements with the architect and advisers (DNR2025 / CR 2013) Overeenkomst met architect en adviseurs (DNR2025 / CR 2013) | At a specialist | NLingenieurs: DNR2025 / BNA |
B. ИССЛЕДОВАНИЯ (onderzoeken)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 9 | Soil sounding (CPT) + foundation advice Sonderingen + funderingsadvies | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 10 | Preliminary soil contamination survey (NEN 5740) Verkennend bodemonderzoek (NEN 5740) | At a specialist | NEN: NEN 5740:2023+C1:2024 |
| 11 | Soil batch testing before removal Partijkeuring grond | At a specialist | unchecked |
| 12 | Nitrogen deposition calculation (AERIUS) Stikstofberekening (AERIUS) | At a specialist | BIJ12: Voortoets Stikstof |
| 13 | Flora and fauna quick scan Quickscan flora en fauna | At a specialist | IPLO: Dit is een flora- en fauna-activiteit |
| 14 | Acoustic survey Akoestisch onderzoek | At a specialist | unchecked |
| 15 | Archaeological survey Archeologisch onderzoek | At a specialist | unchecked |
| 16 | Water assessment / rainwater retention Watertoets / hemelwaterberging | At a specialist | unchecked |
| 17 | Dewatering advice Bemalingsadvies | At a specialist | IPLO: Regels over activiteiten in de waterschapsverordening |
| 18 | KLIC notification (cables and pipes in the ground) KLIC-melding | At a specialist | Kadaster: KLIC-melding |
| 19 | Tree impact analysis / felling permit Bomen Effect Analyse / kapvergunning | At a specialist | unchecked |
| 20 | Sunlight and shadow study Bezonningsstudie | At a specialist | unchecked |
| 21 | Asbestos inventory + demolition notification Asbestinventarisatie + sloopmelding | At a specialist | IPLO: Meldingsplicht sloopactiviteit |
| 22 | Pre-construction survey of neighbouring buildings Vooropname belendingen | At a specialist | IPLO: Inhoud Besluit bouwwerken leefomgeving (hoofdstuk 7) |
| 23 | Unexploded ordnance survey Explosievenonderzoek | At a specialist | unchecked |
| 24 | Spatial justification (BOPA) Ruimtelijke onderbouwing (BOPA) | At a specialist | IPLO: BOPA op hoofdlijnen |
| 25 | Additional environmental studies (air, safety, odour, traffic) Aanvullende omgevingsonderzoeken (luchtkwaliteit, externe veiligheid, geur, spuitzone, verkeer en parkeren) | At a specialist | IPLO: Opvragen informatie beoordelen BOPA |
C. АРХИТЕКТУРА (architect / tekenaar)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 26 | Sketch design (SO) Schetsontwerp (SO) | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 27 | Preliminary design (VO) Voorlopig ontwerp (VO) | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 28 | Site plan 1:500–1:1000 Situatietekening 1:500–1:1000 | We make it | IPLO: Bruidsschat omgevingsplan, art. 22.35 (aanvraagvereisten bouwwerken) |
| 29 | Floor plans 1:100 Plattegronden 1:100 | We make it | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 30 | Elevations 1:100 Gevelaanzichten 1:100 | We make it | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 31 | Sections 1:100 Doorsneden 1:100 | We make it | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 32 | Roof plan Dakplan | We make it | unchecked |
| 33 | Principle details 1:5–1:10 Principedetails 1:5–1:10 | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 34 | Colour and material schedule Kleur- en materiaalstaat | We make it in part | IPLO: Bruidsschat omgevingsplan, art. 22.35 (aanvraagvereisten bouwwerken) |
| 35 | Photos of the existing situation Foto's bestaande situatie | At a specialist | IPLO: Bruidsschat omgevingsplan, art. 22.35 (aanvraagvereisten bouwwerken) |
| 36 | 3D visualisations 3D-visualisaties | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 37 | Tender drawings Bestektekeningen | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 38 | Technical description / specification (STABU) Technische omschrijving / bestek (STABU) | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 39 | Detail book 1:5 Detailboek 1:5 | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 40 | Window and door schedule Kozijn- en deurenstaat | We make it | unchecked |
| 41 | Finishing schedule by room Afwerkstaat / ruimtestaat | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 42 | Working drawings 1:50 Werktekeningen 1:50 | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 43 | Dimensioning and setting-out drawing Maatvoerings- en uitzettekening | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 44 | Opening and penetration drawings Sparingstekeningen | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 45 | Stair drawing Trappentekening | We make it in part | unchecked |
| 46 | Tiling plan / sanitary drawing Tegelplan / sanitairtekening | We make it | unchecked |
| 47 | Kitchen drawing Keukentekening | At a specialist | unchecked |
| 48 | Review of supplier drawings Controle leverancierstekeningen | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 49 | BIM model (IFC) BIM-model (IFC) | At a specialist | unchecked |
D. КОНСТРУКТИВ (constructeur)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 50 | Structural design basis and loads Constructieve uitgangspunten | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 51 | Structural calculation Statische berekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 52 | Stability calculation Stabiliteitsberekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 53 | Foundation drawing + pile plan Funderingstekening + palenplan | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 54 | Excavation pit and basement calculation Bouwkuip- en kelderberekening | At a specialist | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 55 | Floor slab layout plans Vloer- en legplannen | We make it in part | unchecked |
| 56 | Reinforcement drawings + bar bending schedules Wapeningstekeningen + buigstaten | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 57 | Steel structure Staalconstructie | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 58 | Roof and timber structure Kap- / houtconstructie | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 59 | Detail calculations Detailberekeningen | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 60 | Review of supplier calculations Controle leveranciersberekeningen | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
E. РАСЧЁТЫ ПО BBL И СЕРТИФИКАТЫ (bouwfysisch adviseur)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 61 | BENG calculation (NTA 8800) + TOjuli BENG-berekening (NTA 8800) + TOjuli | We make it in part | NEN: overzicht Bbl-normen |
| 62 | MPG calculation MPG-berekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 63 | Daylight calculation Daglichtberekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 64 | Ventilation and purge ventilation calculation Ventilatie- en spuiberekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 65 | Area schedule GO/VG Oppervlaktestaat GO/VG | We make it | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 66 | Rc / U-value calculation Rc- / U-waardeberekening | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 67 | Fire safety check Brandveiligheidstoets | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 68 | Façade sound insulation Geluidwering gevel | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 69 | Moisture and condensation check Vocht- en condensatietoets | At a specialist | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 70 | Bbl compliance report Bbl-toetsrapport | At a specialist | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 71 | Materials passport / GPR / BREEAM Materialenpaspoort / GPR / BREEAM | At a specialist | unchecked |
| 72 | Police Label Secure Housing (Politiekeurmerk Veilig Wonen) Politiekeurmerk Veilig Wonen | At a specialist | CCV: Inbraakbeveiliging |
F. ИНЖЕНЕРНЫЕ СИСТЕМЫ (installatieadviseur)
| # | Name | Who makes it | Source |
|---|---|---|---|
| 73 | Heat loss calculation (ISSO 51) Warmteverliesberekening (ISSO 51) | We make it in part | ISSO: erratum ISSO-51:2023 |
| 74 | Cooling load calculation Koellastberekening | At a specialist | unchecked |
| 75 | Heating drawing + underfloor heating layout Verwarmingstekening + legplan vloerverwarming | We make it in part | unchecked |
| 76 | Ventilation drawing (heat recovery) + commissioning report Ventilatietekening (WTW) + inregelrapport | At a specialist | unchecked |
| 77 | Water supply and sanitary drawing Waterleiding- en sanitairtekening | We make it in part | unchecked |
| 78 | Drainage + rainwater drainage Riolering + hemelwaterafvoer | We make it in part | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 79 | Principle diagrams (plumbing and heating) Principeschema's W | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 80 | Electrical drawings (NEN 1010) Elektrotekeningen (NEN 1010) | We make it in part | NEN: overzicht Bbl-normen |
| 81 | Circuit list + single-line diagram Groepenverklaring + eendraadsschema | We make it in part | unchecked |
| 82 | Cable and short-circuit calculation Kabel- en kortsluitberekening | We make it in part | unchecked |
| 83 | Meter cupboard layout Meterkastindeling | We make it in part | unchecked |
| 84 | Earthing and equipotential bonding Aarding en vereffening | We make it in part | unchecked |
| 85 | Surge protection (NEN 1010, section 443) Overspanningsbeveiliging (NEN 1010, rubriek 443) | At a specialist | NEN: overzicht Bbl-normen |
| 86 | Data / home automation (KNX) Data / domotica (KNX) | At a specialist | unchecked |
| 87 | Smoke detectors and security Rookmelders en beveiliging | At a specialist | Rijksoverheid: Hoeveel rookmelders moet ik in mijn huis hebben? |
| 88 | Applications for utility connections Aanvraag nutsaansluitingen | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
G. ДОППРОЕКТЫ
| # | Name | Who makes it | Source |
|---|---|---|---|
| 89 | Photovoltaic (PV) installation PV-installatie | We make it in part | Solar Magazine (25.11.2024) / Kenteq leermiddel NEN 1010:2020 |
| 90 | Registering PV at energieleveren.nl Aanmelding PV op energieleveren.nl | At a specialist | unchecked |
| 91 | Home battery + EMS Thuisbatterij + EMS | We make it in part | unchecked |
| 92 | Heat pump Warmtepomp | We make it in part | unchecked |
| 93 | Ground energy system Bodemenergie | At a specialist | unchecked |
| 94 | EV charging point Laadpaal | We make it in part | Solar Magazine (25.11.2024) / Kenteq leermiddel NEN 1010:2020 |
| 95 | Rainwater harvesting / infiltration Regenwateropvang / infiltratie | At a specialist | unchecked |
| 96 | Solar water heater / PVT Zonneboiler / PVT | At a specialist | unchecked |
| 97 | Cooling / air conditioning Koeling / airco | At a specialist | unchecked |
| 98 | Fireplace and flue Haard en rookkanaal | At a specialist | unchecked |
| 99 | Swimming pool, sauna, lift Zwembad, sauna, lift | At a specialist | unchecked |
H. ИНТЕРЬЕР И УЧАСТОК
| # | Name | Who makes it | Source |
|---|---|---|---|
| 100 | Interior design + furniture plan Interieurontwerp + meubelplan | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 101 | Kitchen and bathroom design Keuken- en badkamerontwerp | At a specialist | unchecked |
| 102 | Lighting plan Lichtplan | At a specialist | unchecked |
| 103 | Garden design + planting plan Tuinontwerp + beplantingsplan | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 104 | Landscaping of the site Terreininrichting | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 105 | External sewerage and drainage Buitenriolering / drainage | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
I. СМЕТЫ И ДОГОВОР
| # | Name | Who makes it | Source |
|---|---|---|---|
| 106 | Total project cost estimate Stichtingskostenraming | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Voorontwerp |
| 107 | Cost estimate by building elements (NEN 2699) Elementenbegroting (NEN 2699) | We make it | NEN: NEN 2699:2017 |
| 108 | Bill of quantities Hoeveelhedenstaat | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Technisch ontwerp / Bestek |
| 109 | Client's reference estimate Directiebegroting | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Prijs- en contractvorming |
| 110 | Request for quotation and answers to questions Offerteaanvraag + nota van inlichtingen | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Prijs- en contractvorming |
| 111 | Contractor's open-book estimate Open begroting aannemer | At a specialist | unchecked |
| 112 | Overheads, profit and risk (CAR) Staartkosten | We make it in part | unchecked |
| 113 | Quote comparison and award recommendation Offertevergelijking / gunningsadvies | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Prijs- en contractvorming |
| 114 | Construction contract Aannemingsovereenkomst | At a specialist | SER: BouwGarant Contract voor verbouwingen / Woningborg: modelovereenkomsten |
| 115 | Contractor payment schedule Termijnstaat | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 116 | Schedule of additional and omitted work Meer- en minderwerkstaat | We make it in part | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 117 | List of provisional sums Stelpostenlijst | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Prijs- en contractvorming |
| 118 | Guarantee certificate (Woningborg / SWK) Garantiecertificaat (Woningborg / SWK) | At a specialist | Woningborg: Garantie- en waarborgregeling Nieuwbouw 2024 |
| 119 | CAR policy and insurance certificates CAR-polis en verzekeringscertificaten | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 120 | 5% deposit or bank guarantee 5%-depot of bankgarantie | At a specialist | IPLO: Privaatrecht en de Wet kwaliteitsborging |
| 121 | Construction schedule Bouwplanning | We make it | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 122 | Valuation report for mortgage and building deposit Taxatierapport | At a specialist | unchecked |
J. РАЗРЕШЕНИЯ И WKB
| # | Name | Who makes it | Source |
|---|---|---|---|
| 123 | Application for an environmental permit (OPA) Aanvraag omgevingsvergunning (OPA) | We make it in part | IPLO: Bruidsschat omgevingsplan, art. 22.35 (aanvraagvereisten bouwwerken) |
| 124 | Neighbour participation report Participatieverslag | At a specialist | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 125 | Water activity permit (water board) Omgevingsvergunning wateractiviteit | At a specialist | IPLO: Regels over activiteiten in de waterschapsverordening |
| 126 | Flora and fauna permit and species survey Flora- en fauna-activiteit + soortgericht onderzoek | At a specialist | IPLO: Dit is een flora- en fauna-activiteit |
| 127 | Construction risk assessment Risicobeoordeling | At a specialist | IPLO: Bouwmelding en gereedmelding bij de technische bouwactiviteit |
| 128 | Quality assurance plan Borgingsplan | At a specialist | IPLO: Bouwmelding en gereedmelding bij de technische bouwactiviteit |
| 129 | Construction notification (bouwmelding) Bouwmelding | At a specialist | IPLO: Bouwmelding en gereedmelding bij de technische bouwactiviteit |
| 130 | Notice of start and end of construction work Melding start en einde bouwwerkzaamheden | At a specialist | IPLO: afwijkende termijnen meldings- en informatieplichten Bal en Bbl |
| 131 | Health and safety plan (V&G) V&G-plan | At a specialist | Nederlandse Arbeidsinspectie: Bouwprocesbepalingen, veelgestelde vragen |
| 132 | Notification to the Labour Inspectorate and V&G file Kennisgeving Arbeidsinspectie + V&G-dossier | At a specialist | Nederlandse Arbeidsinspectie: Bouwprocesbepalingen, veelgestelde vragen |
| 133 | Construction safety plan (Bbl) and BLVC plan Bouwveiligheidsplan (Bbl) + BLVC-plan (gemeente) | At a specialist | Gemeente Amsterdam: Bodem en uitvoering (bouwwerkzaamheden uitvoeren) |
| 134 | Site layout plan Bouwplaatsinrichting | We make it | IPLO: Veiligheid: regels bij bouwwerkzaamheden |
| 135 | Other notifications (dewatering, demolition, fees) Overige meldingen | At a specialist | unchecked |
| 136 | Official address (house number) decision Huisnummerbesluit | At a specialist | unchecked |
K. СТРОЙКА И СДАЧА
| # | Name | Who makes it | Source |
|---|---|---|---|
| 137 | Inspection plan and material sample approval Keuringsplan + monstergoedkeuring | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 138 | Site meeting minutes and inspection reports Bouwverslagen + keuringsrapporten | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 139 | Quality assurer's statement (kwaliteitsborger) Verklaring kwaliteitsborger | At a specialist | IPLO: Bouwmelding en gereedmelding bij de technische bouwactiviteit |
| 140 | File for the municipality Dossier bevoegd gezag | At a specialist | IPLO: Bouwmelding en gereedmelding bij de technische bouwactiviteit |
| 141 | Notice of completion Gereedmelding | At a specialist | IPLO: afwijkende termijnen meldings- en informatieplichten Bal en Bbl |
| 142 | Consumer file (consumentendossier) Consumentendossier | At a specialist | IPLO: Privaatrecht en de Wet kwaliteitsborging |
| 143 | Energy label (energielabel) Energielabel | At a specialist | RVO: Verplicht energielabel voor utiliteitsgebouwen / Energielabel woningen |
| 144 | Airtightness test (blower door test) Luchtdichtheidsmeting (blowerdoortest) | At a specialist | IPLO: Omgevingsvergunning bij de technische bouwactiviteit (aanvraagvereisten, Omgevingsregeling h. 7) |
| 145 | Electrical installation acceptance inspection (NEN 1010) NEN 1010-opleverinspectie | At a specialist | NEN: overzicht Bbl-normen |
| 146 | Commissioning and measurement reports Inregel- en meetrapporten | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 147 | Pre-handover inspection (voorschouw) Vooroplevering (voorschouw) | At a specialist | unchecked |
| 148 | Handover report with snagging list Proces-verbaal van oplevering | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 149 | Warranties, manuals and KOMO certificates Garanties, handleidingen, KOMO-certificaten | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |
| 150 | As-built drawings Revisietekeningen (as-built) | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Uitvoeringsgereed ontwerp |
| 151 | Second handover after the maintenance period Tweede oplevering | At a specialist | BNA/NLingenieurs: DNR-STB 2014, fase Directievoering |